Everything an exhibition stand needs
Five services, one contractor. You can buy them separately, but the reason most clients take the whole chain is that the handovers between design, production and installation are where projects usually go wrong.
- DesignConcept, 3D visual and production drawings for your plot — so you approve what the stand will look like before anything is built.
- ManufacturingProduction in our own Istanbul workshop — CNC cutting, joinery, surface finishing and pre-assembly before anything leaves the building.
- InstallationOur own crew builds the stand in the hall during the official build-up window, and dismantles it after the show closes.
- StorageAfter the show we dismantle, log and store the reusable parts of your stand in our own warehouse, ready for the next edition.
- PrintingLarge-format digital printing for the stand: wall graphics, fabric panels, backlit faces and applied lettering, colour-matched to your brand.
How a stand gets built
- 1
1. Brief and plot
Fair, hall, plot size, how many sides are open, what you exhibit, what the stand has to achieve and what the budget is.
- 2
2. Design and 3D
A concept developed against the hall's technical regulations, presented as photorealistic views from the aisle. Revised until you approve it.
- 3
3. Production
CNC cutting, joinery and finishing in our own workshop, trial-assembled before it is crated.
- 4
4. Transport and installation
Freight and — when the fair is outside Turkey — customs, then installation by our own crew inside the official build-up window.
- 5
5. Dismantling and storage
Removal after the show, and storage of the reusable parts in our warehouse if you are exhibiting again.
Send us the fair and the plot size, and you get a design proposal and a price. The survey and the 3D design cost nothing.
Why one contractor rather than four
- One drawing, one builder
- The team that designed the stand is the team that cuts it. A detail that cannot be produced is caught on the drawing, not on build-up day.
- One schedule
- Production, freight and the hall's build-up window are planned against each other from the start, rather than negotiated between three companies afterwards.
- One accountable party
- If something is wrong in the hall, there is nobody to point at. That is uncomfortable for us and useful for you.
Tell us your fair and your plot
You get a design proposal and a real price. The survey and the 3D design cost nothing.
