Exhibition stand manufacturing

Part of a turnkey stand

Production in our own Istanbul workshop — CNC cutting, joinery, surface finishing and pre-assembly before anything leaves the building.

What it is

  • Own workshop
  • Quality control
  • On-time delivery
  • Specialist team

What you get

  • We build what we designed — no third-party contractor in between
  • Certified materials with fire-rating documentation where required
  • Trial assembly in the workshop before shipping
  • Progress photos during production

How we work

  1. 1

    Material procurement

    Boards, profiles, glass and fittings, with certificates where the hall requires them.

  2. 2

    Production

    CNC cutting and joinery in our own workshop, to the approved drawings.

  3. 3

    Quality control

    Trial assembly and finish inspection before packing — problems are cheaper to fix here.

  4. 4

    Packing

    Crated for the journey, road or air freight, with a packing list per crate.

Typical duration

10–15 working days

Varies with the size and complexity of the project.

Talk to us

Working hours

Monday – Saturday: 09:00 – 19:00 (UTC+3)